Demolition safety
Contents |
[edit] Introduction
Health and safety is extremely important at all times. It is vital for construction industry professionals to review methods for maintaining safety in demolition.
[edit] Training
Construction workers should receive quality health and safety training. This is true for most industries, but it’s an important factor in many environments and should be vital for any individual using heavy machinery, equipment or leading a team.
When it comes to demolition, training is key. Anyone handling explosive and dangerous materials should know exactly what they are doing and be able to assess outcomes and potential hazards before the demolition. Having adequate training in this area will help to prevent serious accidents, which could be fatal - in particular if they are dealing with explosives.
The types of training individuals can receive for these types of jobs and environments are usually covered when receiving qualifications such as: IOSH, CITB, Working at Height, Risk Assessing and many others.
[edit] Wearing PPE is not an option
Most workers would not walk into a room full of dust and sand without the right equipment. Five-part PPE is standard for these types of situations and environments, which includes: Hard hat, high visibility vest, gloves, safety goggles and steel toe cap boots. In some cases, these items should be worn all time.
[edit] Ensuring the site is clean throughout
Keeping sites clean and safe throughout the entire process should be at the forefront of everyone’s mind - workers and site managers included. Having a clean site is standard amongst most health and safety regulations and should be implemented especially on demolition sites to ensure the safety of workers.
A safe site should ensure that every individual can access fresh drinking water and washing facilities as well as hot water and a clean and safe environment for cooking equipment. It's recommended to allocate storage space to prevent PPE from being over-worn or damaged.
[edit] Double checking during a final sweep
Before the actual demolition begins, it is a good idea to complete one final sweep throughout the entire building, in every room including any small storage areas, toilets, corridors and hallways. This will ensure that no one is left in the building and that every room is completely empty, even of furniture and other items.
During the demolition process, there should be an adequate number of workers securing the surrounding area. Their priority should be to make sure no one gets too close to the site once it starts being demolished, as this is a huge risk to health and safety.
This additional gate keeping of the site should include managing pedestrians and vehicles to ensure there is sufficient access for vehicles and walkways that do not interfere with the site. Keeping a one-way flow of traffic will prevent the need for any reversing of vehicles, which could cause problems if there isn’t a clear enough view for drivers to do so.
[edit] Post-demolition action items
After a building has been demolished, there is an incredible amount of debris; workers will need to cleanup and dispose of this debris properly. Wearing PPE during the cleanup stage is absolutely vital. With debris comes plenty of dust, sand and the potential for asbestos (although this should be removed before the site is demolished).
[edit] Related articles on Designing Buildings Wiki
- Asbestos.
- BREEAM Construction waste management.
- Construction dust.
- Deleterious materials.
- Demolition.
- Explosives.
- Filtering facepieces.
- Health and Safety.
- National Federation of Demolition Contractors NFDC.
- Personal protective equipment PPE.
- Recyclable construction materials.
- Site clearance.
- Site waste management plan.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.
























