Demolition safety
Contents |
[edit] Introduction
Health and safety is extremely important at all times. It is vital for construction industry professionals to review methods for maintaining safety in demolition.
[edit] Training
Construction workers should receive quality health and safety training. This is true for most industries, but it’s an important factor in many environments and should be vital for any individual using heavy machinery, equipment or leading a team.
When it comes to demolition, training is key. Anyone handling explosive and dangerous materials should know exactly what they are doing and be able to assess outcomes and potential hazards before the demolition. Having adequate training in this area will help to prevent serious accidents, which could be fatal - in particular if they are dealing with explosives.
The types of training individuals can receive for these types of jobs and environments are usually covered when receiving qualifications such as: IOSH, CITB, Working at Height, Risk Assessing and many others.
[edit] Wearing PPE is not an option
Most workers would not walk into a room full of dust and sand without the right equipment. Five-part PPE is standard for these types of situations and environments, which includes: Hard hat, high visibility vest, gloves, safety goggles and steel toe cap boots. In some cases, these items should be worn all time.
[edit] Ensuring the site is clean throughout
Keeping sites clean and safe throughout the entire process should be at the forefront of everyone’s mind - workers and site managers included. Having a clean site is standard amongst most health and safety regulations and should be implemented especially on demolition sites to ensure the safety of workers.
A safe site should ensure that every individual can access fresh drinking water and washing facilities as well as hot water and a clean and safe environment for cooking equipment. It's recommended to allocate storage space to prevent PPE from being over-worn or damaged.
[edit] Double checking during a final sweep
Before the actual demolition begins, it is a good idea to complete one final sweep throughout the entire building, in every room including any small storage areas, toilets, corridors and hallways. This will ensure that no one is left in the building and that every room is completely empty, even of furniture and other items.
During the demolition process, there should be an adequate number of workers securing the surrounding area. Their priority should be to make sure no one gets too close to the site once it starts being demolished, as this is a huge risk to health and safety.
This additional gate keeping of the site should include managing pedestrians and vehicles to ensure there is sufficient access for vehicles and walkways that do not interfere with the site. Keeping a one-way flow of traffic will prevent the need for any reversing of vehicles, which could cause problems if there isn’t a clear enough view for drivers to do so.
[edit] Post-demolition action items
After a building has been demolished, there is an incredible amount of debris; workers will need to cleanup and dispose of this debris properly. Wearing PPE during the cleanup stage is absolutely vital. With debris comes plenty of dust, sand and the potential for asbestos (although this should be removed before the site is demolished).
[edit] Related articles on Designing Buildings Wiki
- Asbestos.
- BREEAM Construction waste management.
- Construction dust.
- Deleterious materials.
- Demolition.
- Explosives.
- Filtering facepieces.
- Health and Safety.
- National Federation of Demolition Contractors NFDC.
- Personal protective equipment PPE.
- Recyclable construction materials.
- Site clearance.
- Site waste management plan.
Featured articles and news
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.
























